• FR
  • EN
  • Shopping Cart

    x

    Shopping Cart

    Your cart is currently empty.

    6x6m Booth Kit with S-Curve Display, Square Arches & 4 Counters

    • Unit price per 
    • SKU : MOD-EXHIBIT-20x20-05
  • Free delivery (7 working days)

  • Select the frame size, printing sides & frame structures options
    Upload your designs now or you can upload later
    Téléchargez ou envoyez votre illustration par e-mail
    Recevez une maquette 2D gratuite par e-mail
    Approuvez votre conception par e-mail
    Nous commençons l'impression de votre commande

    Delivery

    >

    Key Features

    • S-shape portable exhibit display adds visual movement and flow to the layout
    • Two square arch displays create inviting, open walk-through structures
    • TV mount supports screens up to 32 inches—ideal for digital presentations or branding
    • Four rectangle counters provide multiple touchpoints for interaction, demos, or product showcasing
    • Eight printed backdrops offer flexibility for varied branding across the setup
    • Comes with soft nylon carry bags for easy transport and storage
    • Perfect for large-scale exhibitions, brand activations, and trade show booths needing height and visual variety

    Shipping & Installation

    • Production Lead Time: 24 business hours after artwork approval
    • Domestic Shipping: Delivered in 5–7 business days across the UK.
    • International Shipping: Available with customs-ready support
    • Pickup Services: Not available — all items are shipped
    • Installation: Optional professional setup available on request
    • Assembly Video: Watch on YouTube

    Product Dimensions

    Component Frame Dimensions Graphics Dimensions Package Dimensions
    Portable Exhibit Display (S Shape) 1.0m Wide x 2.7m Height 100.6cm Wide x 259.1cm Height 27.9cm x 27.9cm x 73.7cm
    Square Arch Display (x2) 4.0m Length x 1.0m Wide x 2.7m Height See template for details. 81.3cm x 33.0cm x 30.5cm
    Rectangle Counter (x4) 0.8m Wide x 1.0m Height x 0.5m Depth 238.8cm Wide x 100.6cm Height 83.8cm x 11.9cm x 58.4cm
    Total Weight 54.4kg

    Product Specifications

    • Frame Type : Lightweight, collapsible aluminium frame designed for easy transport and quick setup
    • Fabric Material : Wrinkle-resistant, tear-proof polyester fabric suitable for vibrant and clear graphics
    • Portable Exhibit Display (S Shape) : Stylishly curved fabric backdrop designed to add a dynamic visual flow to your booth—ideal for showcasing bold branding or messaging.
    • TV Mount : Secure mount compatible with medium-sized screens, enabling seamless integration of digital presentations or promotional videos.
    • Square Arch Display : Modern square-shaped structures that frame your booth beautifully while offering surfaces for graphic display and built-in functionality.
    • Rectangle Counter : A practical booth element for customer interaction, product demos, and literature placement.
    • Printed Backdrops with Cotton Bag : Custom-designed fabric graphics delivered in protective cotton bags for easy portability and clean storage.
    • Soft Nylon Bags : Durable and lightweight bags for protecting and carrying display components.

    What's included

    • 1 x Portable Exhibit Display (S shape) - 1.0m W x 2.7m H
    • 1 x TV Mount - supports up to 32 inches
    • 2 x Square Arch Display - 4.0m L x 1.0m W x 2.7m H
    • 4 x Rectangle Counter - 0.8m W x 1.0m H x 0.5m D
    • 8 x Printed backdrops with cotton bag
    • Soft Nylon Carry Bags

    Artwork and file setup

    We accept your artwork through WeTransfer, Dropbox, Google Drive, Email, or directly via the Upload Artwork button above. If you don't have a design ready, our in-house creative team is here to help — we'll bring your brand to life with a professionally designed layout tailored to this product.

    To ensure you're confident before we print, we also offer a FREE 2D mockup preview. Use the "Request Free 2D Mockup Image" button at the top of the page and send us your content or files. We'll show you how your backdrop will look in real life.

    Category Specification
    Accepted Formats AI, PSD, PDF (high resolution preferred)
    Resolution Minimum 150 DPI at full size
    Bleed 2.5cm on all sides (keep text/logos away from edges)
    Colour Mode CMYK for optimal print accuracy
    Fonts Outline all fonts or attach font files